Question
What is the total approved cost for the 8 National
High-Speed Road Corridor projects sanctioned by the Cabinet Committee on Economic Affairs (CCEA) in August 2024?Solution
The CCEA, chaired by Prime Minister Narendra Modi, approved 8 National High-Speed Road Corridor projects spanning 936 kilometers across India with an allocated budget of Rs 50,655 crore. This investment is projected to generate significant employment and bolster economic growth through enhanced connectivity.
The base of a triangle is 18 cm and height is 12 cm. The height of another triangle of double the area having the base 24 cm is:
The perimeter of a rectangle is 68 cm more than its length. If the length and breadth of the rectangle are in the ratio 7:5, respectively, then find the...
In the figure given below, PQRS is a parallelogram in which PN and PM are perpendicular to QR and RS, respectively. If RS = 81 cm, PM = 42 cm and PN = 5...
The area of four walls of a room is 192 cm2. If the length and breadth of the room were equal and the height of the room is 6 cm, then what i...
The distance of the School and house of Suresh is 80 km. One day he was late by 1 hour than the normal time to leave for the college, so he increased hi...
Curved surface area of a cylinder is 440 cm². The base circumference is 44 cm. What is its volume?
The dimensions of a rectangular park are 54 meters in length and 'b' meters in breadth. Given that the perimeter of the park is 168 meters, determine th...
If (x² + 1/x2) = 4, which of the options below is a possible value of x² - 1/x2 ?
Length and breadth of a rectangular room are in the ratio 4 ∶ 5. The perimeter of the room is 180 m. Cost of flooring is Rs. 75 per square metre. Find...
The volume of a cube is 64 cm³. If the cost of painting the cube is Rs. 15 per cm², then find the cost of painting five faces of the cube.