Start learning 50% faster. Sign in now
The European Investment Bank (EIB) will lend €300 million for Bangalore Metro Rail Project Phase II Line R6. Bangalore Metro Rail Project Phase II will be jointly financed by the European Investment Bank (€500 million) and Asian Infrastructure Investment Bank (€300 million). The agreement signed today was for first tranche of €300 million. The project envisages extension of East-West and North-South lines for Bangalore Metro Rail which includes a total length of 72.095 km (13.79 km underground) and 61 stations with 12 underground stations.
Without stopping the speed of the train is 130 kmph, with stopping the speed of the train is 65 kmph.Find the stop time of the train?
Two trains A and B, were proceeding in the same direction on parallel tracks at 25 km/hr and 79 km/hr respectively. A man noticed that it took exactly 1...
A train travels at a speed of 72.6 kn/hr. How many kilometres will it travel in 15 minutes?
A train 500 m long running at 90 km/hr takes 40 seconds to cross a bridge. The length of the bridge is
Time is taken by two trains running in opposite directions to cross a man standing on the platform in 28 seconds and 16 seconds respectively. It took 24...
A 160 m long train crosses another 280 m long train running in the opposite direction in 11 seconds. If the shorter train crosses a pole in 8 seconds, w...
A train, which is moving at the rate of 60 miles per hour, is brought to rest in 3 minutes with a uniform retardation, find this retardation, and also t...
720 metres long train crosses a man who is moving in the same direction with a certain speed, in 30 seconds. If the same train can cross a tree in 20 se...
Train A running at speed of 90 km/hr crosses a platform having twice the length of train in 12 sec. Train B whose length is 340m crosses same platform i...
Ratio of the lengths of two trains ‘X’ and ‘Y’ is 3:4 respectively and the ratio of time taken by them to cross a pole is 1:2 respectively. If s...