Start learning 50% faster. Sign in now
Union Minister of State for Railways Darshana Jardosh, has shared the first glimpse of Surat’s Bullet Train station. She has shared the graphical illustration of the railway station to be constructed between the Mumbai- Ahmedabad route. The construction of bullet train station in Surat is scheduled to be completed by December 2024. The bullet train station in Surat will be the first in India to be built between Mumbai–Ahmedabad High-Speed Rail Corridor (MAHSR). The MAHSR corridor will have 12 stations namely Surat, Vadodara, Anand, Ahmedabad, Sabarmati, Bilimora, Bharuch, Mumbai, Thane, Virar, Boisar, Vapi stations. The Ahmedabad-Mumbai high-speed train project will reduce the travel time between Mumbai in Maharashtra and Ahmedabad in Gujarat to 2.07 hours with limited stops and 2.58 hours with stopping at every station.
Small reddish brown spot surrounded by water soaked margin with yellow holes appear on soybean pods are the symptoms of:
Rate of growth per unit of dry matter is indicated by
What is maximum optimal temperature for wheat crop?
Who first saw and described a live cell under microscope?
The higher yield of C4 plants than C3 plants is due to:
Which among the following state has highest alkaline soil?
Among the given crops, which crop has the highest percentage of irrigated area?
Which chemical is used to inhibit mold growth in bread?
Which one the following sets shows the correct soil order in sequence of increasing age?
The organelle responsible for protein synthesis in plant cells is the: