Question
Consider the following statements regarding
hydroelectric power generation in India. Which of these statements are correct? 1. By April 2024, 15 GW of hydroelectric projects were under construction in India, and hydro capacity is expected to rise from 42 GW (operational) to 67 GW by 2031-32. 2. The fall in hydro power generation in 2023-24, compared to 2022-23, was largely due to less rainfall in the southern region and natural disasters (flash floods) in Himachal Pradesh and Eastern India. 3. Hydroelectric power has always played a key role in India's energy landscape, providing essential peaking support to the electricity grid. 4. The southern region contributes about 45% to India’s total hydroelectric power generation.Solution
The correct answer is B
Adopting green technologies in power generation, which has a lock-in effect lasting decades, and other areas like transport with immediate impacts such...
- The given question has one blank indicating that something has been omitted. Choose the word for the given options that could fit in the blank correctly. <...
It happened …….. I found it difficult to cope ………. the foreign crew.
In each of the questions below, a sentence is given with two blanks that indicate that some parts are missing. Identify the correct pair of words that ...
The __________ of new projects in the energy sector is __________ not only on low cost or profitability of the project but also on the sustainability.
The ____________recruit was ready to join the Army and signed up the day he turned eighteen.
- In the following questions, each sentence has two blanks. Choose the appropriate set of words for the blanks that best fits in the context of the sentence....
If they were nervous, it was pretty tough to tell, they had such a friendly, ___________ way about them.
1) built
2) said
3) issued
4) made
5) nurtured
 Fill in the blank with the correct preposition.
The group of actors drove _____________ the forest at high speed.