Question
With reference to Chhatrapati Shivaji Maharaj
International Airport (CSMIA), Mumbai, consider the following statements: 1.CSMIA was ranked 9th globally in the Travel + Leisure World’s Best Awards 2025, making it the only Indian airport in the top 10 for three consecutive years. 2.It is the world’s busiest single-runway airport, handling over 55 million passengers annually with 54 international and 67 domestic connections. 3.The airport is operated by Mumbai International Airport Limited (MIAL), a joint venture between the Adani Airport Holdings (74%) and the Airports Authority of India (26%). Which of the above statements is/are correct?Solution
• Statement 1 – Correct:  CSMIA was ranked 9th globally in the Travel + Leisure World’s Best Awards 2025 with a reader score of 84.23. It is the only Indian airport to feature in the top 10 for three consecutive years. • Statement 2 – Correct:  With 55.12 million passengers annually, CSMIA is India’s second busiest airport and also the world’s busiest single-runway airport, connecting to 54 international and 67 domestic destinations. • Statement 3 – Correct:  The airport is managed by Mumbai International Airport Limited (MIAL), a joint venture of Adani Airport Holdings (74%) and the Airports Authority of India (26%).
Working together A and B can do a job in 40 days, B and C in 36 days and all three together in 24 days. In how many days can B alone do the job?
A car running with a speed of 69 km/hr takes 28 hours to go from 'A' to 'B'. If on the way back from 'B' to 'A', the car takes 20% less time than it tak...
A can complete 25% of the work in 4 days, B can complete 50% of the same work in 12 days and C can complete the same work in 32 days. They staned worki...
A’ and ‘B’ together can complete a work in 8 days, while ‘B’ and ‘C’ together can complete the work in 12 days...
A and B can together complete a task in 18 hours. After 6 hours A leaves. B takes 36 hours to finish rest of the task. How many hours would A have take...
An elephant can do a work as fast as two horses ‘A’ and ‘B’ can do it by working together. If horse ‘A’ alone can co...
A is thrice as efficient as B and can finish a piece of work in 28 days less than B. B can finish this work in how many days?
Two trains of length 200m and 160m respectively are running on parallel lines of rails. When running in the same direction the faster train passes the s...
'A' and 'B' can finish a task together in 30 days. They worked together for 18 days and then left. The rest of the task was done by 'C' in 12 days. How ...
A started a work such that he can complete the whole work in 30 hours. After working for 10 hours, he worked with the rate such that the whole work can ...