Start learning 50% faster. Sign in now
The Aswan Dam, comprising the Aswan Low Dam and the Aswan High Dam, is situated on the Nile River in Egypt. It plays a crucial role in controlling floods, providing water for irrigation, and generating hydroelectric power.
"A" can finish a task in 36 days, while "B" can complete it in 45 days. Both start working on the task together, but "A" stops working after "x" days. ...
Amit, Bheema, and Chetna can finish the task in 32 days, 24 days, and 30 days respectively. If they start the task together, and ...
A tank is filled by three pipes with uniform flow. The first two pipes operating simultaneously fill the tank in the same time during which the tank is ...
A and B together can complete a piece of work in 10 days. A alone can complete the work in 15 days. How many days will B take to complete the work alone?
A and B together, B and C together and A and C together can complete a piece of work in 14 days, 15 days and 18 days respectively. Find the ratio of the...
Anand and Manav can collaboratively finish a task in {40/3} days, while Anand alone requires 24 days to complete the same task. Given that Prachi's effi...
A, B, and C can complete a job in 15, 20, and 30 days, respectively. They start the work together but after 3 days, A leaves. Then, B works alone for 5...
P and Q can do a piece of work in 32 and 40 days respectively. They began to work together but P leaves after sometimes and Q completed remaining work i...
G' can complete (3/4) of a job in 24 days, while 'G' and 'H' together can complete the same job in 16 days. Find the time taken by 'H' to complete 25%...
‘A’ and ‘B’ can do a piece of work in 22 days and 25 days, respectively. If they started the work together and worked on it for 6 days, then fin...