Question
Which of the following projects is part of the National
Industrial Corridor Development Programme (NICDP) approved by the Union Cabinet?Solution
The NICDP includes projects in various states, such as Rajpura-Patiala, Dighi, and Palakkad, aiming to enhance Indiaβs manufacturing capabilities.
Three runners A, B and C run a race, with runner A finishing 12 meters ahead of runner B and 18 meters ahead of runner C, in another race of same type r...
Two trains X and Y start at the same time in the opposite direction from two points P and Q and arrive at their destinations 25 and 16 hours respectivel...
A thief snatched a lady's purse and began running north towards a bus that was 200 meters away. A policeman, who was standing 40 meters south of the lad...
How much time a train 200 metres long running at the speed of 72 km/hr take to cross a bridge 180 metres in length?Β Β Β Β Β
If a car runs at 30 km/hr, it reaches its destination late by 17 minutes but if runs at 45 km/hr it is late by 9 minutes. What is the correct time for t...
A woman must travel 500 km in 10 hours. If she traveled the first 30% of the journey at a constant speed of 50 km/h, at what speed must she travel the r...
- A cyclist moves from location βLβ to location βMβ, covering (1/2) of the total distance in 4 hours and the rest in 3 hours. If he comes back to β...
<p><p>If a wheel covers a distance of 880 m in 40 rotations, then the diameter of the wheel is?</p></p>
Ratio of speeds of βAβ and βBβ is 5:7, respectively. If they participate in a 350-metre race and βBβ gives βAβ, a head start of βmβ ...
A train running at 72 km/hr takes 20 seconds to pass a platform and the train takes 6.5 seconds to pass a car running at 36 km/hr in the opposite direct...