Question
The total length of the fully operational Delhi–Meerut
RRTS corridor is:ÂSolution
With the inauguration of the remaining sections, the entire 82-km Delhi–Meerut RRTS corridor became operational, integrating with the Meerut Metro system. Â
In the following questions, four words are given in bold. One of them may be incorrectly spelt. Identify the incorrectly spelt word. If all are correct...
Select the INCORRECTLY spelt word.
In the question below, a sentence is given, four words have been highlighted in bold. Find out if the words are appropriate (grammatically and contextu...
- In each of the questions below, a sentence is given with four words highlighted in bold in the sentence. Among these bold words one may be wrongly spelt. T...
As I got closer , I realize that the metal cage was in fact a small trap .
...Choose the word with correct spelling.
1) depraive
2) deprave
3) deprayve
4) deprawve
5) none of these
The building was so old that its walls were cracked bad.
U.S. President Donald Trump opened up another front in the ongoing global trade war on Wednesday by ramping up retoric against the World Trade Organizat...
In the following questions, four words are given in bold. One of them may be incorrectly spelt. Identify the incorrectly spelt word. If all are correct...