    The total length of the fully operational Delhi–Meerut

    RRTS corridor is: 
    A 72 km Correct Answer Incorrect Answer
    B 78 km Correct Answer Incorrect Answer
    C 82 km Correct Answer Incorrect Answer
    D 90 km Correct Answer Incorrect Answer
    E 96 km Correct Answer Incorrect Answer

    Solution

    With the inauguration of the remaining sections, the entire 82-km Delhi–Meerut RRTS corridor became operational, integrating with the Meerut Metro system.  