      The total length of the fully operational Delhi–Meerut

      RRTS corridor is: 
      A 72 km Correct Answer Incorrect Answer
      B 78 km Correct Answer Incorrect Answer
      C 82 km Correct Answer Incorrect Answer
      D 90 km Correct Answer Incorrect Answer
      E 96 km Correct Answer Incorrect Answer

      Solution

      With the inauguration of the remaining sections, the entire 82-km Delhi–Meerut RRTS corridor became operational, integrating with the Meerut Metro system.  