Question
What capacity does NTPC’s hydrogen filling station in
Leh have?Solution
The hydrogen filling station in Leh, part of NTPC’s Green Hydrogen Mobility Project, has a capacity of 80 kg/day.
The 11th term of an AP is 80 less than the first term. If the second term is 88, find the third term.
The interest earned when a sum is invested at simple interest of 25% p.a., for 3 years, is Rs. 1875. What will be the total amount received after 2 year...
14, 28, 56, 112, ...... The sum of first 10 numbers in the series is:
If P represents the largest single-digit prime number, determine the fourth proportional to the numbers (P + 3), (P - 2), and (P + 5).
What is the mean of the following numbers:
45, 50, 55, 60, 65
The sum of total surface area of two cubes is 1248-centimeter square. If the product of the length of their edges is 96 centimeter square. Find the diff...
A boat takes 17 hours to travel from P to Q upstream and from Q to P downstream. If the speed of the boat in still water is 8.5 km/h and the speed of th...
If the median and mode of some observations is 5 and 9, respectively, then find the mean of those observations.
The cost of an item is 'A'. A shopkeeper increases the price by 'x'%, then applies a discount of 'd'% on the increased price. Aft...
The sum of three numbers is 226. If the ratio of the first to the second is 4:5 and that of second to the third is 7: 10 then the second number is?