Question
If 36 persons can finish 50% of work in 12 days In how
many days 72 person can finish the complete work?Solution
let the total work =1 M1 D1 H1/W1 = M2 D2 H2/W2 36×12 /(1/2) =72×D2 /1 D2 =12days.
- Two circles have radii of 18 cm and 32 cm, and they touch each other externally. What is the length of a common tangent between them?
O and C are the respectively orthocentre and circumcentre of ∆PQR. The line PO is extended which intersect line QR at S. such that, ∠QCR = 140°, �...
Find the area of triangle having sides 28 m, 45 m, and 53 m.
If O is circumcentre of acute angled triangle ABC, if ∠ BAC = 35˚ then ∠ BOC = ?
The total of the perimeter of a rectangle and the circumference of a circle is 156 cm. The rectangle's length equals the side of a square, and the squar...
If I is the incentre of ΔABC , if ∠ BAC = 300 , then what is the measure of ∠ BIC?
A triangular field has sides 13 m, 14 m, and 15 m. A well with a diameter of 7 m is dug outside the field. If the entire soil dug from the well is used ...
If I is the incentre of ΔABC , if ∠ BAC = 650 , then what is the measure of ∠ BIC?