8 workers working for 8 days make 8 motor cycles. Then
how many motor cycles would be made by 4 workers if they work for 4 days? Assume equal efficiency of each worker.Solution
ATQ, If 8 workers make 8 motorcycles in 8 days, each worker makes 1 motorcycle in 8 days. Now, let’s see how many motorcycles 4 workers can make in 4 days: 1 worker makes 1/8 of a motorcycle in 1 day. So, 1 worker makes 4/8 (which is 1/2) of a motorcycle in 4 days. If 1 worker makes 1/2 a motorcycle in 4 days, 4 workers will make 4 times as much in 4 days, because there are 4 of them: 4 workers make 4 x (1/2) = 2 motorcycles in 4 days.
The sum of three consecutive odd natural numbers each divisible by 3 is 81. Which number is the largest number among the three numbers?
What is the ratio of the sum of the squares of the first 8 natural numbers to the sum of the first 12 odd natural numbers?
- A room contains three shelves: the 1st, 2nd, and 3rd. The number of books on the 1st and 2nd shelves are in the ratio of 6:11, while the number of books on...
- Instead of multiplying a number by 0.9, a student accidentally used 9. His result turned out to be 3510 more than the actual result. What is the original n...
Two numbers P and Q are in the respective ratio 7: 9 and their sum is 80. Then, P is equal to:
The sum of the digits of a two-digit number is 9. If 27 is subtracted from the number, its digits switch their places. What is the number?
The value of √(56+√(56 +√(56+ √(56+√56+ ................ )) )) is
Aman is forming pairs of two natural numbers, A and B, such that their product equals 350. He wants to determine how many such pairs exist where A and B...
Find the maximum value of (x + y) if 7x52y4 is divisible by 12.