      The installation-ready subsystem for a naval radar

      communication network showcased during the BEL–SASMOS event was developed within what time period?
      A 3 months Correct Answer Incorrect Answer
      B 6 months Correct Answer Incorrect Answer
      C 9 months Correct Answer Incorrect Answer
      D 12 months Correct Answer Incorrect Answer
      E 18 months Correct Answer Incorrect Answer

      Solution

      The subsystem for a naval radar communication network was designed, developed, and qualified within six months by the SASMOS engineering team. This highlights rapid development capability in defence-grade electronic systems.