    The installation-ready subsystem for a naval radar

    communication network showcased during the BEL–SASMOS event was developed within what time period?
    A 3 months Correct Answer Incorrect Answer
    B 6 months Correct Answer Incorrect Answer
    C 9 months Correct Answer Incorrect Answer
    D 12 months Correct Answer Incorrect Answer
    E 18 months Correct Answer Incorrect Answer

    Solution

    The subsystem for a naval radar communication network was designed, developed, and qualified within six months by the SASMOS engineering team. This highlights rapid development capability in defence-grade electronic systems.