Question
The West Bengal State Cabinet approved development
projects worth Rs 4,648 crore in partnership with which international organization to improve secondary education and child nutrition infrastructure?Solution
The projects aimed at strengthening secondary education and Integrated Child Development Services (ICDS) infrastructure in West Bengal are being implemented with financial support from the Asian Development Bank.
A person is walking at 6 m/sec in the same direction of a train. The train crosses him in 5 seconds. If speed of the train is 108 km/hr, find the time t...
A train 480 metres long is running at a speed of 54 km/hr. If it crosses a tunnel in 1 minute, then the length of the tunnel (in meters) is:
Train A running at a speed of 48 km/hr crosses train B in 30 seconds. Find the speed of train B (in km/hr), if the sum of the length of train A and B is...
- A train can cross a bridge and a pole in 7.5 seconds and 5 seconds respectively. The length of the bridge is 50 metres. Find the time taken by train to cro...
A train 180 m long crosses a 270 m platform in 27 seconds. Find the speed in km/h.
Train βAβ is travelling with a speed of 108 km/hr and crosses a vertical pole in 5 seconds. Train βBβ is 40 metres longer than βAβ and trav...
A train traveling at 43.2 km/h takes 'm' seconds to pass a pole. What is the length of the train in meters?
A train travelling at the speed of 72 km/hr crosses another train, having 40 meters less length and travelling in opposite direction at the speed of 54 ...
Two trains of same length are running in parallel tracks in the same direction with speed 84 km/hr and 120 km/hr respectively. The latter completely cro...
Train P travelling at 60 km/hr crosses another train Q, having three fourth of its length and travelling in opposite direction at 30 km/hr in 28 seconds...