Question
What was the total length of the Rudrastra freight train
operated during the Indian Railways trial?Solution
The Rudrastra freight train, trialed by Indian Railways, is Asia’s longest freight train, measuring 4.5 km in length. It was composed of 345 wagons, each carrying 72 tonnes, and required seven engines to operate efficiently.
Consideration is ₹1.90 crore fixed plus a ₹20 lakh performance bonus if go-live is achieved in 4 months (historically achieved only 40% of the time)...
The first Annual General Meeting of the company shall be held ______________
Read the following information to answer the below questions:Â
Under GST, the 'Reverse Charge Mechanism' (RCM) implies that the tax is paid by:
What is the threshold limit for deduction of tax at source for the dividends subject to DDT under Section 115-0?
How do Priority Sector Lending (PSL) compliance requirements differ between foreign banks with 20 or more branches and those with fewer than 20 branches?
A company maintains average receivables of ₹5 lakh, inventory of ₹3 lakh, and payables of ₹2 lakh. If cost of goods sold is ₹60 lakh annually, c...
According to AS 3, "Cash Equivalents" are:
A company begins construction of a qualifying asset funded partly from general borrowings. Work was suspended for 5 months due to a strike. Should borro...
Which cost method would capitalise fixed manufacturing overheads per unit?