Question
What is the installed capacity of the Tato-I Hydro
Electric Project approved for Arunachal Pradesh?Solution
The Tato-I Hydro Electric Project in Arunachal Pradesh has an installed capacity of 186 MW, with a ₹1,750 crore investment approved by the Cabinet.
The 11th Agricultural Census (2021-22) was launched in the country on 28th July 2022. The Agricultural census is conducted in every ____ years.
Which one of the following is not a method for calculation of depreciation:Â
The isolation distance for the production of foundation seed in bajra is:
The microbodies that are specialized for the beta oxidation
Micro water shed has an area of
What is the recommended planting geometry for achieving optimal light interception and air circulation in maize under normal conditions?
Insectivorous plant show which type of movements?
Extension of medullary rays form ____
Which of the following is not a factor of production?
Which among the following is an example of Pseudocarpic fruit?