Question
What is the estimated cost of the Ken-Betwa
river-linking project?Solution
The Ken-Betwa river-linking project, aimed at addressing water scarcity in Bundelkhand, has an estimated cost of ₹45,000 crore. It includes provisions for drinking water, irrigation, and hydropower, which are crucial for the development of the region.
Select the figure that will come next in the following figure series.
In a certain code language, ‘SILK’ is written as ‘TIML’ and ‘INSECT’ is written as ‘IOTEDU’. How will ‘CHANGE’ be written in that la...
Read the given statements and conclusions carefully. Assuming that the information given in the statements is true, even if it appears to be at variance...
Three statements in this question and three related conclusions have been given to them, assuming that the statements given in the statements to be true...
To reach point B from point A, Anita must walk 70 m towards the west, then she must take a right turn and walk 70 m, then she must take a left turn and ...
Read the given statements and conclusions carefully. Assuming that the information given in the statements is true, even if it appears to be at variance...
Select the option figure that is embedded in the given figure (X) as its part (rotation is NOT allowed).
In the following question, select the missing number from the given series.
60, 64, 72, 88, 120, ?
Select the set in which the numbers are related in the same way as are the numbers of the following sets.
(NOTE: Operations should be performed o...
Prakash is standing facing the West. He takes a left turn after walking 2 m. Then he walks 3 m, takes a left turn and walks 3 m. He takes a last left tu...