Question
What significant milestone was achieved in the Arun III
hydropower project in Nepal with Indian assistance?Solution
The significant milestone achieved in the Arun III hydropower project was the completion of the 11.8 KM headrace tunnel, marking substantial progress in the project.
A constant retarding force of 20 N is applied to a body of mass 10 kg moving initially with a speed of 12 m sβ1. How long does the body tak...
Which of the following terms does not represent electrical power in a circuit ?
___________ is an important mineral nutrient
The joint where the neck joins the head is known as which of the following?
In a nuclear reactor, one of the following is used as a fuel.
When a detergent is added to pure water, its surface tension β
Kilowatt-hour is the unit of :
The absolute zero is a temperature at which -
What is the principle behind the operation of a washing machine?