How many statements about SJVN's Gujrai Solar Power Station is/are incorrect?
1. SJVN Limited commissioned its 50 MW Gujrai Solar Power Station in Uttar Pradesh.
2. The project was executed by SJVN through its renewable arm, SJVN Green Energy Limited (SGEL).
3. The estimated cumulative energy generation over 25 years is 2,477 million units.
• SJVN Limited, a Mini Ratna, Category-I and Schedule ‘A’ Central public sector enterprise under the administrative control of Ministry of Power, Government of India, has begun the successful commercial operation of its 50 MW Gujrai Solar Power Station in Kanpur Dehat, Uttar Pradesh. • With this milestone, the total installed power capacity of SJVN stands at 2,277 MW, with ten power stations currently operational. • The 50 MW Gujrai Solar Power Station has been executed by SJVN through its renewable arm, SJVN Green Energy Limited (SGEL) at a cost of Rs. 281 crores. • The project will generate 107 million units in the first year and the cumulative energy generation over a period of 25 years is estimated to be 2,477 million units. Learn Along: About Uttar Pradesh Chief minister: Yogi Adityanath Governor: Anandiben Patel Capital: Lucknow
Select the odd number from the given alternatives.
2197 4098 3375 1728
Four letter-cluster have been given, out of which three are alike in some manner and one is different. Select the letter-cluster that is different.
Select the odd letters from the given alternatives?
Find the odd one out:
Four letter-cluster have been given, out of which three are alike in some manner and one is different. Select the letter-cluster that is different.
Odd one out
Select the odd group of numbers. (NOTE: Operations should be performed on the whole numbers, without breaking down the numbers into its constituent dig...
Four word-pairs have been given, out of which three are alike in some manner and one is different. Select the odd one.
Pick the odd one out.
Find the odd one out.
A, E, I, L, Q, U