Question
What is the primary purpose of the MoU signed between
REC Limited and RailTel?Solution
The MoU between REC Limited and RailTel aims to extend financial assistance of up to Rs. 30,000 Crore for infrastructure projects, including Data Center products and services, Telecom & IT products and services, Railways & Metro projects, and the KAVACH Train Collision Prevention System.
If 15th step of a given input be ‘the service would be from midnight to noon’, what would be the input
...If step IV of an input is ‘the knee joint of animal to see remains’, what is the step III of that input?
Which element is third to the left of second element from the right end in step IV?
Given the following input ‘This disease is not common in the world, what would be the VIth step?
Which of the following elements is third to the left of the 10th element from the left in Step III?
How many elements are there between ‘03’ and ‘45’ in step-II?
How many steps are required to complete the rearrangement of the given input?
If following is the second step for an input, what will be the fourth step?
Step II: 46 122 343 48 56 212 415
If the entry code of Batch C on Tuesday (2nd May, 2017) was “the user can also over ride bionic hand control", then what was the entry ...
Input: he does not even claim that motifs
Which of the following steps will be the last but one?