Question
What is the estimated annual capacity of the
waste-to-energy facility in Dubai?Solution
The Emirate of Dubai has recently announced the introduction of the largest waste-to-energy facility on a global scale.  Valued at AED4 billion ($1.1 billion), this state-of-the-art plant has the capacity to convert a staggering 2 million tonnes of solid waste annually, generating enough energy to power approximately 135,000 households. The project is meticulously designed to have no adverse impact on the environment, positioning Dubai as a pioneering city in the realm of sustainability. About Dubai Capital: Abu Dhabi            Currency: UAE dirham
The average age of A, B and C is 28 years, while the average age of B, A and D is 24 years. If the ratio of the age of C and D is 5:3, respectively, the...
Which of the following is/are types of strike?
     I.       Hunger Strike
   II.       Go-slow strike
The ratio of two numbers is 7 : 5, and their HCF is 6. What is their LCM?
If ‘I’ stands for ‘+’, ‘J’ stands for ‘×’, ‘K’ stands for ‘÷’, and ‘L’ stands for ‘−’, what will come in place of th...
Traits can be influenced by:
What does the term "out of order" typically refer to in the context of loans?Â
A student focuses a sharp image of the sun using a spherical mirror on a sheet of paper, which starts to burn after some time. Which of the following st...
Which one of the following pairs is incorrectly matched?
Which of the following statements is/are incorrect in regards to the Hakki Pikki tribe?
- The tribe is divided into four c...
Eight friends, A, B, C, D, E, F, G, and H are sitting around a square table facing the centre of the table. Four of them are sitting at the corners whil...