Question
North India's first nuclear power plant will be set up
in which state?Solution
North India's first nuclear power plant is being built in Gorakhpur city of Haryana . Â According to the Department of Atomic Energy, under the Gorakhpur Haryana Anu Vidyut Project ( GHAVP ) , there are two units of 700 MW capacity . A total of Rs 20,594 crores has been allocated for this nuclear power plant project, out of which Rs 4,906 crores have been spent so far . The Union Minister of State for Science and Technology, Jitendra Singh stated that the Modi government at the Center has given approval for the establishment of 10 such nuclear reactors .
At what time was the temperature the lowest?
The average weight of boys in a class is 65 kg, while the average weight of girls is 45 kg. If the overall average weight of the class is 50 kg and the ...
The perimeter of a square field is 10 cm more than the perimeter of a rectangle. The length of the rectangle is 60 cm which is 80% of its width. If a st...
Cost of two types of pulses is Rs.12 and Rs, 17 per kg, respectively. If both the pulses are mixed together in the ratio 2:3, then what should be the pr...
A shopkeeper has 68 kg rice a part of it, he sells at the profit of 44% and rest at loss of 24% and he get the loss of 16% so what is the quantity sold ...
Length and breadth of a rectangular field is (x + 5) cm and (x – 4) cm, respectively. If the cost of ploughing the field at a rate of Rs. 7 per cm² i...
How much groundnut powder at Rs. 90 a kg. should be added to 56 kg. of cashew powder at Rs.310 a kg. so that by selling the mixture for Rs. 280 a kg...
11kg of tea costing Rs. 440 per kg is mixed with 14 kg of tea costing Rs. 360 per kg. The average price per kg of the mixed tea is
In a mixture of milk and water, there is only 16% water. After replacing the mixture with 8 liters of pure milk , the percentage of milk in the mixture ...
33.98 X 17.99 - (7.99 X 8.99) ÷ 1.99 - 27.99 X 4.01 = ? X 3.99