Start learning 50% faster. Sign in now
Indian Renewable Energy Development Agency Limited (IREDA) has signed a loan agreement with KFW namely, KFW VI line of credit for financing ‘Access to Clean Energy Projects’ meant for decentralized solar applications. The total sanctioned amount of the agreement is EUR 20 million. The entire amount has been utilized as of 30th March, 2022.
A train 'D' departed from Lucknow at 7:00 PM, traveling at a speed of 66 km/h, and reached Kolkata. Meanwhile, Train 'C' left Kol...
A train takes 18 seconds to cross a platform and 6 seconds to cross a pole. If the length of the train is 70 metres less than the length of the platform...
Train P travelling at 50 km/hr crosses another train Q, having three fourth of its length and travelling in opposite direction at 40 km/hr in 14 seconds...
A train can cross a pole, a bridge of 510 meter long and platform of 480 meter long in 15 seconds, _____ seconds and 31 seconds, respectively.
Th...
A train moves at 90 km/h to arrive at its station on time. If it moves at 100 km/h, it will arrive 15 minutes earlier. Find the t...
A train travelling with a speed of 36 km/h can cross a pole in 9 seconds. Find the time taken by the train to cross a 180 metres long platform if the sp...
The time taken by train B to cross a platform of 120 metres is 3 sec less than the time taken by train A to cross the same platform. The sum of length o...
A train 450 metre long takes 45 sec to cross a man running at a speed of 4 km/hr in the direction same to that of train. What is the speed of the train?
Two trains of same length are running in parallel tracks in the same direction with speed 40 km/hr and 100 km/hr respectively. The latter completely cro...