Start learning 50% faster. Sign in now
Get Started with ixamBee
Start learning 50% faster. Sign in nowA wind turbine taller than the world's tallest Statue of Unity has been installed at Mundra in Gujarat by Adani New Industries Ltd as part of its renewable energy expansion plans. The turbine has been installed by Mundra Windtech Ltd (MWL), a wholly-owned subsidiary incorporated by Adani Enterprises Ltd (AEL). This prototype is also the first addition to the portfolio of Adani New Industries Ltd (ANIL) and has laid the foundation for installation of even bigger wind turbine generators. The wind turbine has the capacity to produce 5.2 MW of electricity and can power approximately 4,000 homes. Adani New Industries Ltd Headquarters: Ahmedabad Founder: Gautam Adani
If Ax 2 (x + 2) + 8 + 36x = (2 + 3x) 3 , then determine the value of 3 √A.
Which of the following options gives the value of 2999² – 999²?
If ab + bc + ca = 0
Find the value of 1/(a2 - bc) + 1/(b2 - ca) + 1/(c2 - ab)
If x = (2+√3)/(2-√3), y = (2-√3)/(2+√3). Then find out the value of (x²+y²-xy)/(x²+y²+xy)?
If (528 – 507 + 195) ÷ 11 + √1296 = x, then {(x/2) + 10} = ?
If (5x + 2)3 + (x – 1)3 + 8(3x – 7)3 = 6(5x + 2) × (x – 1) × (3x – 7), then the value of (5x + 3) is
...In △ ABC, AB = AC. A circle drawn through B touches AC at D and intersect AB at P. If D is the midpoint of AC and AP = 2.5 cm, then AB is equal to: