Start learning 50% faster. Sign in now
100 MW Ramagundam floating solar PV project in Telangana is declared operational from 1st July 2022. It is the largest project of its kind in India. "Consequent upon successful commissioning, last part capacity of 20 MW out of 100 MW Ramagundam floating solar PV project at Ramagundam, Telangana is declared on commercial operation with effect from 00:00 hours of 01.07.2022," it said in a BSE filing. With this, the standalone installed and commercial capacity of NTPC has become 54,769.20 MW, while group installed and commercial capacity is 69,134.20 MW. NTPC Headquarters: New Delhi CMD: Gurdeep Singh
____ infected larvae becomes flaccid, skin becomes fragile and it crawls to the top of the plant to hang upside down with the help of prolegs. ...
Which of the following is a maintainer line?
Which of the following is not a characteristic of Prokaryotic cell?
A wide variety of living organisms is called
Science dealing with the outbreak and spread of disease in a population is called as
The condition where crops are unable to absorb water from soil even when water is available is:
Which of the following are non-nutrient compounds found in plant derived food that have biological activity in the body.
Which of the following plants does not have independent and free-living male and female gametophytes?
choose the correct option
Statement I: Sodic soils cannot be reclaimed with hydrotechincal method of reclamation
Statement II: Hydro techn...
Which of the following statement is incorrect?