Start learning 50% faster. Sign in now
Union Minister of State for Railways Darshana Jardosh, has shared the first glimpse of Surat’s Bullet Train station. She has shared the graphical illustration of the railway station to be constructed between the Mumbai- Ahmedabad route. The construction of bullet train station in Surat is scheduled to be completed by December 2024. The bullet train station in Surat will be the first in India to be built between Mumbai–Ahmedabad High-Speed Rail Corridor (MAHSR). The MAHSR corridor will have 12 stations namely Surat, Vadodara, Anand, Ahmedabad, Sabarmati, Bilimora, Bharuch, Mumbai, Thane, Virar, Boisar, Vapi stations. The Ahmedabad-Mumbai high-speed train project will reduce the travel time between Mumbai in Maharashtra and Ahmedabad in Gujarat to 2.07 hours with limited stops and 2.58 hours with stopping at every station.
One yard is 91% of a metre. What percent is one metre of one yard?
The IRDAI (Insurance Regulatory and Development Authority of India) was formed based on the recommendations of which committee?
Citigroup Inc has planned to sell their Indian consumer businesses to the private lender ____ for $1.6 billion.
Which of the following Articles of the Constitution gives Parliament the power for the formation of new states?
Which famous empire was established by Harihar and Bukka?
Maharana Pratap, a contemporary of Akbar, was a ruler of which of the following kingdoms?
The Indian Air Force has unveiled a new initiative with the Indian Oil Corporation Ltd.