Question
A project costs ₹1 Cr, generates ₹30 L per year
for five years, with required return 10%. What’s the NPV?Solution
PV annuity factor ≈ 3.7908; PV = ₹30 L × 3.7908 = ₹1.1372 Cr NPV = ₹13.72 L
Freedom from variable errors is known as:
The scientific study of diseases in plants caused by pathogens (infectious organisms) and environmental conditions (physiological factors) is called
With reference to the Government of India’s latest order to impose stock limits on pulses (2025–26), consider the following statements:
1....
Which term refers to the average population level of an insect over a long period of time?
The PMGSY-IV scheme aims to provide how many kilometers of all-weather road connectivity?
Which pesticides are non-biodegradable and also called recalcitrant pesticides
Who among the following is known as Father of Tillage
Satellite-based crop yield estimation under PMFBY is carried out using which system?
How much is the Maximum Premium payable by the farmers for Kharif crops under the PMFBY?
The share of agriculture and allied sectors in India’s total GVA at current prices (2024–25 PE) is approximately: