Question
Which of the following statements are not correct:
1.   Project Design and network analysis refers to detailed work plan to the project and its time profile 2.   There is a prescribed format for the preparation of a project report. 3.   A project plan is a formal, approved document that is used to manage and control a project. 4.   The promoter’s capacity and competence should be examined with reference to their management background, traits as entrepreneurs, business or industrial experience 5.   The Economic Appraisal consists of two parts: measurement of the distribution of the income due to the project and identification of the impact on the basic needs objectives of the society.Solution
There is no prescribed format for the preparation of a project report. Measurement of the distribution of the income due to the project and identification of the impact on the basic needs objectives of the society are parts of Social/distributive Appraisal and not Economic appraisal
Find the remainder when the number (625n + 378) is divided by 25.
What is the digit in the units place of the number (1624)24 ?
In a class of 40 students, 60% are boys and the rest are girls. If 50% of the boys and 70% of the girls passed the exam, how many students failed the exam?
 If the sum of two numbers is 33 and their difference is 15, the smaller number is
The sum of two numbers is 18 while the sum of their squares is 164. Find the sum of the cubes of those two numbers.
If the sum of two positive numbers is 37 and the difference between these two numbers is 5, then what is the product of the two numbers?
If X + Y = 23 and XY = 126, what is the value of (X)² + (Y)² ?
Find the remainder when the number (256n + 105) is divided by 16.
What is the average of first 26 multiples of 2.6?
Find the value of: 37 × 25 + 37 × 75 without doing full multiplication separately.