Question
Which of the following statements are not correct:
1. Project Design and network analysis refers to detailed work plan to the project and its time profile 2. There is a prescribed format for the preparation of a project report. 3. A project plan is a formal, approved document that is used to manage and control a project. 4. The promoter’s capacity and competence should be examined with reference to their management background, traits as entrepreneurs, business or industrial experience 5. The Economic Appraisal consists of two parts: measurement of the distribution of the income due to the project and identification of the impact on the basic needs objectives of the society.Solution
There is no prescribed format for the preparation of a project report. Measurement of the distribution of the income due to the project and identification of the impact on the basic needs objectives of the society are parts of Social/distributive Appraisal and not Economic appraisal
A cyclist was moving with a speed 20 km/hr. Behind the cyclist at a distance of 100 km was a biker moving in the same direction with a speed of 40km/hr....
Find the value of (25)ᶟ + (–29)ᶟ + (4)ᶟ
The Blind river dolphins are found in the water of:
Match List I with List II
Choose the correct answer f...
Which one of the following rivers flows in a rift river?
A, B, C, D and E are standing in row. 'A' is between 'B' and 'D'. E is not at the starting of row. 'C' is just before D. Study above statement and answe...
In the given figure ABCD is a rhombus, the value of x is.
Two numbers are in ratio of 7 : 10 and if the sum of the numbers is 119. Find the difference of the numbers.
The practice of erecting megaliths began about 3000 years ago, and was prevalent throughout the Deccan, South India, in the North-East and Kashmir. All ...