Which of the following statements are not correct:
1. Project Design and network analysis refers to detailed work plan to the project and its time profile 2. There is a prescribed format for the preparation of a project report. 3. A project plan is a formal, approved document that is used to manage and control a project. 4. The promoter’s capacity and competence should be examined with reference to their management background, traits as entrepreneurs, business or industrial experience 5. The Economic Appraisal consists of two parts: measurement of the distribution of the income due to the project and identification of the impact on the basic needs objectives of the society.Solution
There is no prescribed format for the preparation of a project report. Measurement of the distribution of the income due to the project and identification of the impact on the basic needs objectives of the society are parts of Social/distributive Appraisal and not Economic appraisal
Which grain can a gluten intolerant person safely consume?
An institute at the State level for training of State department of agriculture people is
The bacterial colony is known as:
World food safety day celebrated on?
Which state has the highest share of Cotton production in terms of area?
Under which ministry does the Cotton Corporation of India (CCI) operate?
In India, maximum production of food grain, accounts approximately _____ % of total Indian food grain production
Total Polar Compounds are formed when:
Tungro disease of rice is caused by
Cooperative marketing in India has _______ tier structure.