The stage of communication model in which easy and less technical jargons are used before the communication for smooth flow of communication is ______
In this stage the sender first identifies the target audience in simple language to be able to encode the message in a manner that results in smooth flow of information. Discussed in live classes many times
Girish can paint a picture in 4 days when he works for 8 hours per day. Due to illness, he could work for only 6 hours per day and was required to finis...
A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 12 days, and C alone in 24 days, in wha...
A can do 50% of the job in 16 days, B can do 1/4th of the job in 24 days. In how many days can they do 3/4th of the job working together?
Pipe A can fill the tank 5 times faster than pipe B, if pipe A and B together fill the tank in 50 minutes, then pipe B alone can fill the tank in:
Two trains of length 200m and 160m respectively are running on parallel lines of rails. When running in the same direction the faster train passes the s...
Pipes A and B can fill an empty tank in 6 and 8 hours respectively, while pipe C can empty the full tank in 10 hours. If all three pipes are opened toge...
A, B and C can do a work in 8, 16 and 24 days respectively. They all begin together. A continues to work till it is finished, C leaving off 2 days and B...
A trip from Mumbai to Pune takes 4 hours 30 minutes at a speed of 60 km/hr. How long (in hours) will it take to complete, if the speed is 15m/sec?
A flight has to travel between 2 cities A and B, 2000 km apart. The flight was slowed down due to bad weather. Its average speed for the trip reduced by...
If 10 men can complete a piece of work in 12 days by working 7 hours a day, then in how many days can 14 men do the same work by working 6 hours a day?