What are the mismatch tolerance levels for time bucket of 15 – 28 days in the ALM statement?
In case the net cumulative negative mismatches during the Day 1, 2-7 days, 8-14 days and 15- 28 days buckets exceed the prudential limit of 5 % ,10%, 15 % and 20% of the cumulative cash outflows in the respective time buckets, the bank may show by way of a foot note as to how it proposes to finance the gap to bring the mismatch within the prescribed limits.
Train A running at speed of 81 km/hr crosses a platform having twice the length of train in 12 sec. Train B whose length is 360m crosses same platform i...
A train passes an electrical pole in 14 seconds and passes a platform 360 m long in 50 seconds. Find the length of the train.
Time is taken by two trains running in opposite directions to cross a man standing on the platform in 36 seconds and 21 seconds respectively. It took 27...
Train P travelling at 60 km/hr crosses another train Q, having three fourth of its length and travelling in opposite direction at 30 km/hr in 28 seconds...
Two trains start at the same time from Patna and Delhi and proceed toward each other at the speed of 120 km/hr and 60 km/hr respectively. When they meet...
A train running at 25 km/hr takes 36 seconds to pass a platform. Next, it takes 14 seconds to pass a man walking at 7 km/hr in the same direction. Find ...
Two trains of same length are running in parallel tracks in the same direction with speed 84 km/hr and 120 km/hr respectively. The latter completely cro...
Train A running at speed of 99 km/hr crosses a platform having twice the length of train in 18 sec. Train B whose length is 390m crosses same platform i...
Train P starts from Lucknow to Dehradun at 11:55 am with an average speed of 30 m/s. Train Q starts from Dehradunto Lucknowat 1:35 pm with an average sp...
Two trains ‘A’ and ‘B’ started from station ‘P’ and ‘Q’ towards station ‘Q’ and ‘P’ respectively at the same time. When they met...