Question
A project management technique which uses time as the
variable is known asSolution
PERT is an acronym for Program (Project) Evaluation and Review Technique, in which planning, scheduling, organising, coordinating and controlling of certain activities take place. The technique studies and represents the tasks undertaken to complete a project, to identify the least time for completing a task and the minimum time required to complete the whole project.
Time is taken by two trains running in opposite directions to cross a man standing on the platform in 36 seconds and 21 seconds respectively. It took 27...
Train 'A' travels at a speed of 54 km/hr and passes a stationary pole in 12.4 seconds. How long will it take for Train 'A' to completely pass Train 'B',...
Train M, βxβ metres long crosses (x β 30) metres long platform in 20 seconds while train N having the length (x + 30) metres crosses the same plat...
A train 180 m long passes a man standing on a platform in 12 seconds and passes the platform completely in 30 seconds. Find the speed of the train in km...
- Train βXβ is 360 metres long and takes 18 seconds to cross a pole. Speed of train βYβ is 22 m/sec. If both trains cross each other in 16 seconds wh...
- Train 'A' having a speed of 12 m/s can cross a man in 10 seconds. The length of train 'B' is 180 metres more than the length of 'A'. If the speed of 'B' is...
'Pritampur' and 'Kanpur' divide by (d - 100) km, while 'Kanpur' and 'Delhi' are distanced by (d + 150) km. Between the stations of Pritampur and Kanpur,...
A train takes 5 seconds more to cross a 180-metre-long platform than it takes to cross a pole. If a car running at the speed of 42 m/s takes 80 seconds ...
Two trains of same length are running in parallel tracks in the same direction with speed 60 km/hr and 90 km/hr respectively. The latter completely cros...
A train moving at 72 km/h takes 20 seconds to pass a pole. Find the time required for the train to cross a platform that is 0.6 times the length of the ...