Start learning 50% faster. Sign in now
Get Started with ixamBee
Start learning 50% faster. Sign in now6 Pillars of PM Gati Shakti Comprehensiveness: It will include all the existing and planned initiatives of various Ministries and Departments with one centralized portal. Prioritization: Through this, different Departments will be able to prioritize their projects through cross-sectoral interactions. Optimization: For the transportation of the goods from one place to another, the plan will help in selecting the most optimum route in terms of time and cost. Synchronization: PM Gati Shakti will help in synchronizing the activities of each department, as well as of different layers of governance, in a holistic manner by ensuring coordination of work between them. Analytical: The plan will provide the entire data at one place with GIS-based spatial planning and analytical tools having 200+ layers, enabling better visibility to the executing agency. Dynamic: All Ministries and Departments will now be able to visualize, review and monitor the progress of cross-sectoral projects, through the GIS platform. It will help in identifying the vital interventions for enhancing and updating the master plan. So, it won’t be accessible to the Private Sector players.
Two trains approach each other at 21 kmph and 25 kmph from 2 places 230 km apart. After how many hours they will meet?
A train approaches a tunnel a PQ. Inside the tunnel a cat located at a point i.e., 7/16 of a distance PQ measured from the entrance P. When the train wh...
Train A running with a sped of 126 km/h crosses a vertical pole in 22 seconds. Speed of train A is 6 m/s less than speed of train B, and length of train...
A train 400 metres long is running at a speed of 54 km/hr. If it crosses a tunnel in 1 minute, then the length of the tunnel (in meters) is:
Car 'X' travels for 4 hours to reach from point A to B. Car 'Y' travels 210 km to reach from point B to C in 3 hours. Distance travelled by car 'X' to c...
Two trains started from stations ‘A’ and ‘B’ at same time and started travelling towards each other at speeds of 80 km/hr and 70 km/hr, respecti...
Two trains, A and B, cross each other in 15 seconds and 35 seconds respectively, when running in opposite and the same direction respectively. If the sp...
Train ‘A’ takes 12 seconds to cross a pole and 30 seconds to cross a 360 metre long bridge. If the length of the train had been 200 metres then find...
Train A running at speed of 99 km/hr crosses a platform having twice the length of train in 18 sec. Train B whose length is 390m crosses same platform i...