Question

Which of the following factors are considered for the purpose of ABC analysis of materials? (i) Usage of the material in units (ii) Cost per unit of each material (iii) Delivery time for each material (iv) Order cost for each material

A Both (i) and (ii)
B Both (i) and (iv)
C Both (ii) and (iii)
D Both (iii) and (iv)