Question
The internal check is a part
of:Solution
Internal Check is an integral part of the internal control system. It refers to the allocation of duties and the design of procedures such that the work of one person is automatically checked by another, with the aim of preventing or early detection of errors and frauds.
If the regression coefficients of x on y and y on x are -1/4 and -1/9 respectively, then what is the correlation coefficient between x and y?
Of 10 computer chips, 4 are defective. What is the probability of selecting 3 without replacement, only one of which is defective?
What is the standard error of regression y on x when the standard deviation of y is 2 and the coefficient of determination is 0.36
What is the currency deposit ratio (cdr)?
C= 0.8(1-t)Y , t=0.25, I=200 and G=800. Calculate the change in output when tax rate increases to 0.50
Under a fixed exchange rate system (A)_________ would be an exogenous monetary policy instrument, whereas under a flexible exchange rate system (B) ____...
If interest payments are subtracted from gross fiscal deficit, the remainder will be
The GDP’s (at factor cost) and population sizes of two countries A and B were identical in a particular year. Which of the following statements is the...
If a country’s policy makers were to continuously use expansionary monetary policy in an attempt to hold unemployment below the natural rate the long-...
Which of the following is an automatic stabilizer in macroeconomics?