Question
A budget that is prepared based on a single level of
activity is known as a:Solution
A Static Budget, also known as a Fixed Budget, is prepared for a single, planned level of activity. It does not change with actual changes in activity levels. A Flexible Budget (A), in contrast, is designed to change with the volume of activity.
- The time required by a boat to travel (x β 40) km against the stream is equal to the time it takes to go (2x β 80) km with the stream. If the speed of ...
A boy can swim in water with a speed of 15 km/hr in still water. If the speed of the stream is 8 km/hr, what will be the time taken by the boy to cover ...
Speed of current is equal to 20% of speed of boat in still water. If the boat takes 4 hours to cover 120 km in still water, then find the time taken by ...
Speed of current is equal to 25% of speed of boat in still water. If the boat takes 5 hours to cover 120 km in still water, then find the time taken by ...
When travelling downstream, a boat takes 4.25 hours to travel 204 km. If the speed of the stream is (3/8)th of downstream speed of the boat, ...
The speed of a boat in still water is twice the speed of the current. The difference between downstream and upstream speeds is 16 km/h. If the boat spen...
Speed of current is equal to 30% of speed of boat in still water. If the boat takes 6 hours to cover 120 km in still water, then find the time taken by ...
A boat travels 48 km against the current and 144 km with the current in a total of 9 hours. If the speed of the boat in still water exceeds the stream s...
A boy can swim a certain distance downstream in 4 hours and return in 7 hours. If the rate of stream is 6 kmph then what is the speed of boy in still wa...
A boat goes 7km an hour in still water, it takes thrice as much time to go the same distance against the current in comparison to the direction of the c...