Question
A company receives advance from customer for contract
work. On balance sheet, this advance is:Solution
Advances for unperformed obligations are contract liabilities (current or non-current depending on timing).
A train running at the speed of 35 metre per second crosses a bridge in 30 seconds. Another which is 130 metre shorter than the previous train crosses t...
A was travelling from point X to point Y. He increased his speed by 14 km/h after every hour. He reached his destination in 18 hours. If his initial spe...
If a bus travel 20 km in 15 minute then how much time take if speed is decrease by 20 km/h?
- In a race of 1.8 km, 'C' gives 'D' a head start of 360 metres and still beats him by 180 metres. If 'D' takes 21 minutes to complete the race, what is the ...
A bike covers a certain distance in 1.8 hours while moving at a speed of 80 km/h. Later, due to traffic, the speed decreases and it takes 2 hours to cov...
 A, B, and C run around a Circular track starting from the same point simultaneously and in the same direction at 6 km/h, 12 km/h, and 18 km/h respect...
Average speed of ‘A’ during a 20-hour journey is 30 km/h. If he covered the first 240 km of his journey at a speed of 20 km/h, then find the speed a...
Anshul lives on 20th floor and Keshav lives on 57th floor. Anshul goes up at a rate of 36 floors per minute and Keshav comes down at a rate of 38 floo...
A car travels from A to B, a distance of 180 km. It covers the first 60 km at 40 km/h, the next 60 km at 60 km/h and the last 60 km at 90 km/h. Find the...
A train 180 meters long passes a man walking in the same direction at 6 km/h in 15 seconds. What is the speed of the train?