Product X requires 10 Kg of material at the rate of Rs.
5 per Kg. The actual consumption of material for the manufacturing of product X came to 12 Kg of material at the rate of Rs. 6 per Kg. Calculate material cost variance.Solution
The correct answer is D
The given question is followed by two statements. You have to find out which statement(s) is/are sufficient to answer the following question, Read the i...
Select the option which is related to the third word exactly as the second word is related to first one.
Enjoyable : Pleasant : : Excellent : ?
Which of the following letter-clusters will replace the question mark (?) in the given series?
RI, PK, LO, FU, XC, ?Â
 Based on some logic, ‘CLONE’ is written as ‘BLUKU’ and ‘BOUND’ is written as ‘AOAKT’. Following the same logic, ‘NICHE’ can be wri...
Select the triad that follows the same pattern as that followed by the two triads given below. Both triads follow the same pattern.
NP - MR - LT<...
A transparent sheet with a pattern is given. Choose from the four alternatives as to how the pattern would appear when the transparent sheet is folded a...
Six persons A, B, C, D, E and F are sitting in a line. E is between D and F. A is second to the right of F. C is at extreme right. Who is sitting at se...

If 5 May 2000 is a Friday, then what will be the day of the week on 12 August 2010?Â
Select the correct combination of mathematical signs that can sequentially replace * to balance the following equation.
20 ∗ 4 ∗ 6 ∗ 2 ∗ ...