A can do a piece of work in 15 days while B can do it in 18 days. Starting with A, they work on alternate days till the work gets over. How many days i...
A and B can do job in 10 days. B and C can do same job in 12 days. A, B and C together can do same job in 8 days. In how many days A and C together can ...
A, B and C can individually complete a piece of work in 24 days, 15 days and 12 days,respectively. B and C started the work and worked for 3 days and le...
A motorboat whose speed is 20 km/h in still water takes 30 minutes more to go 24 km upstream than to cover the same distance downstream. If the speed of...
A can do (2/5) of a work in 6 days and B can do 30% of the same work in 3 days. They worked together for 4 days. The remaining work was completed by C a...
A man on the top of a tower, standing on the sea-shore, finds that a boat coming towards him takes 10 minutes for the angle of depression to change fro...
An elephant can do a work as fast as two horses ‘A’ and ‘B’ can do it by working together. If horse ‘A’ alone can co...
A and B alone can complete a work in 30 and 60 days, respectively. 50% of the work is completed by C in 6x days, and the remaining work is completed by ...
A can finish the work in 40 days and B in 30 days. They both work together for 5 days and then B leaves. How many days will A take to complete the remai...
A can complete 25% of the work in 4 days, B can complete 50% of the same work in 12 days and C can complete the same work in 32 days. They staned worki...