Question

    Match List 1 with List II List I

    List II A. Parallel system I. Junction box B. Grouping system II. Bedding system C. Special drains III. Mixed system D. Surface drains IV. Grid system   Choose the correct answer from the options given below
    A A-IV; B-III; C-I; D-II Correct Answer Incorrect Answer
    B A-III; B-II; C-I; D-IV Correct Answer Incorrect Answer
    C A-I; B-II; C-III; D-IV Correct Answer Incorrect Answer
    D A-IV; B-II; C-III; D-I Correct Answer Incorrect Answer

    Solution

    They are the sub surface drainage systems. Parallel system is Grid system, Grouping is a mixed system, Junction box are special drains and bedding system is followed in surface drainage system

    Practice Next

    Relevant for Exams: