Question
C can do a piece of work in 20 days, and D can do the
same work in 25 days. They start working together, but after 8 days, C leaves. In how many more days will D finish the remaining work?Solution
Work done by C in 1 day = 1/20 Work done by D in 1 day = 1/25 Work done by C and D together in 1 day = (1/20) + (1/25) Taking LCM of 20 and 25 = 100, Work done together = (5/100) + (4/100) = 9/100 Work done in 8 days = 8 × (9/100) = 72/100 = 18/25 Remaining work = 1 - 18/25 = 7/25 D’s work rate = 1/25     Time taken by D to finish = (7/25) ÷ (1/25) = 7 days. Correct Option: c) 7 days
Which of the following statement(s) is/are correct?
(I) The area of a parallelogram with a base of ...
A shopkeeper bought two article A&B for a total of rupees 3500. He marked Article A 140% above its cost price and sold it after giving a discount of 20%...
The area of a square is 900 cm2 which is 120 cm2 less than that of a rectangle. Find the perimeter of the rectangle if the length ...
‘479385A267’ is ten-digit number which is divisible by 9, what is the value of ‘A’?
What is the median of the following list of numbers: 5, 3, 6, 9, 11, 19,12,20, and 1?
What is the sum of the first 14 terms of an arithmetic progression if the first term is -21 and last term is 40?
Find the mode of the following data:
Find the sum of 12th terms of a geometric progression whose 1st term is 8 and common ratio is 2.
The 5th and 8th term of an arithmetic progression are 13 and -5 respectively. What is the 15th term?
If the angular diameter of the sun is 20, how far from the eye a coin of radius 3.3 cm be kept to hide the sun?