Question
C can do a piece of work in 20 days, and D can do the
same work in 25 days. They start working together, but after 8 days, C leaves. In how many more days will D finish the remaining work?Solution
Work done by C in 1 day = 1/20 Work done by D in 1 day = 1/25 Work done by C and D together in 1 day = (1/20) + (1/25) Taking LCM of 20 and 25 = 100, Work done together = (5/100) + (4/100) = 9/100 Work done in 8 days = 8 × (9/100) = 72/100 = 18/25 Remaining work = 1 - 18/25 = 7/25 D’s work rate = 1/25     Time taken by D to finish = (7/25) ÷ (1/25) = 7 days. Correct Option: c) 7 days
As per Union Budget 2025-26, what is the total outlay proposed for the Nuclear Energy Mission aimed at Small Modular Reactors (SMRs)?
What was the specific reason RBI imposed a penalty of ₹31.80 lakh on Bank of Maharashtra?
Which of these countries unveiled an off-grid green hydrogen pilot plant in the year 2025?
Which co-oeprative bank has been recently included in the second schedule of RBI Act?
What is the theme of the International Day of Education 2025?
In Bonds, coupon refers to
Which denomination notes will be introduced as plastic currency in India?
________ happen when RBI desires that liquidity should be squeezed from the economy but Banks are not eager to deposit money with RBI at rate fixed by RBI.
In MUDRA Bank, what does MUDRA stands for -
Following are the functions of the Reserve Bank of India (RBI) except?