Question
C can do a piece of work in 20 days, and D can do the
same work in 25 days. They start working together, but after 8 days, C leaves. In how many more days will D finish the remaining work?Solution
Work done by C in 1 day = 1/20 Work done by D in 1 day = 1/25 Work done by C and D together in 1 day = (1/20) + (1/25) Taking LCM of 20 and 25 = 100, Work done together = (5/100) + (4/100) = 9/100 Work done in 8 days = 8 × (9/100) = 72/100 = 18/25 Remaining work = 1 - 18/25 = 7/25 D’s work rate = 1/25     Time taken by D to finish = (7/25) ÷ (1/25) = 7 days. Correct Option: c) 7 days
Growing grasses in orchards between the trees without tillage or mulching is calledÂ
Anaerobic respiration is called as
The unconsolidated debris overlying the hard, unweathered bedrock is called as
White leghorn is a poultry breed famous for
Which of the following is a ‘P’ solubilizing bacteria?
Which among the following can be classified as often cross pollinated species?
Level of optimum production is available at
By product after cream separation process is
In plant, the cell walls of ___ cells are coagulated with the deposition of suberin which makes them impervious to water and air.
The application of organic manures in the soil helps in/tends to: