Question
A can complete a work in 20 days, B can complete it in
25 days, and C can complete it in 30 days. If all three work together, how long will it take to finish the work?Solution
Work done by A in one day = 1/20. Work done by B in one day = 1/25. Work done by C in one day = 1/30. Combined work in one day = (1/20 + 1/25 + 1/30). Finding a common denominator (LCM = 300): = (15 + 12 + 10) / 300 = 37/300. Time taken to finish the work together = 300/37 ≈ 8.1 days. Correct option: d) 8 days
Which of the following correctly defines the "RotoDynamic Pumps"
FRI ( forest research institute ) was established is located at
Sodium hypochlorite is used:
What is the recommended intercropping method for Bengal Gram cultivation?
The alcohol (Ethanol) is used for the precipitation ofÂ
Which new breed evolved through the grading up local buffalo of coastal andhra pradesh with murrah over generation     Â
Which non-reducing disaccharide is hydrolysable by acids to glucose with difficulty and is stored as a reserve food supply in an insect's hemolymph?
Blade hoe is primarily used for:
What is the term for the measurement of a tree's cross-sectional area, which is typically determined by measuring the diameter of the tree trunk at brea...
Gestation period of Sheep