Question
24 men can complete a task in 16 days. 32 women can
complete the same task in 24 days. 8 men and 8 women start working together and work for 8 days. How many more men are required to complete the remaining work in 4 days?Solution
Given: 24 men → 16 days → total work = 384 man-days 32 women → 24 days → total work = 768 woman-days So, 1 man = 2 women Work done by 8 men + 8 women in 8 days 8 women = 4 men ⇒ total = 8 + 4 = 12 men Work = 12 × 8 = 96 man-days Remaining work Total = 384 man-days Done = 96 Left = 384 – 96 = 288 man-days Men needed to finish in 4 days 288 ÷ 4 = 72 men Already have 8 men ⇒ Extra men = 72 – 8 = 64
If the Earth stopped rotating, what would happen to the apparent value of gravity (g) at different locations?
What does the slope of a velocity-time graph represent?
The resistance of a wire is directly proportional to:
What does 'IC' stand for in electronics?
When heated from 0° to 10°C volume of a given mass of water will -
A soap bubble expands isothermally and its radius doubles. The work done by surface tension during this expansion is:
A uniform wire is bent into a circle and a battery is connected across a chord that subtends an angle of 60° at the center. What is the ratio of curren...
A 10 μF capacitor is charged to 50 V and then connected across an uncharged 20 μF capacitor. What is the final potential difference across both capac...
The emission of a beta-minus particle from a nucleus results in:
Which law states that the current through a conductor is directly proportional to the voltage across it?