Question
A hollow iron pipe is 21 cm long and its
exterior diameter is 8 cm. If the thickness of the pipe is 1 cm and iron weighs 8 g/cm 3 , then the weight of the pipe isSolution
The pipe can be assumed as hollow cylinder. Thickness = 1 cm Internal radius = 4 - 1 = 3 cm. Volume of the material =`pih(R^2-r^2)` `=22/7xx21xx(4^2-3^2)` `= 22/7xx21xx7` = 462 cm 3 Now, 1cm 3 iron weighs = 8 gm 462 cm 3 iron weighs = 462 × 8 gm ` =(462xx8)/1000kg` = 3.696 kg
P can do a piece of work in 15 days, Q can complete double the work in 40 days and R can do the work in 20 days. If all of them together earn Rs. 3000, ...
- Alex and Ben can complete a job individually in 14 days and 21 days, respectively. If they take turns to work one day each, beginning with Alex, how long w...
βXβ and βYβ can do a task together in 15 days. If βXβ alone takes 25 days to complete it, then how much time will βYβ take to finish the...
βPβ and βQβ can complete a task together in 24 days. If βPβ alone can do it in 40 days, find the number of days βQβ alone will take to f...
A can complete a work in 40 days. B takes 20 days less than A to complete the same work. In how many days can both of them together complete 90% of the ...
P can do a piece of work in 30 days. Q do the same work in 40 days. R can do it in 35 days. P and R worked for 4 days and handed it to Q. Q worked for s...
X can do a piece of work in 15 days. He worked at it for 3 days and then Y finished it in 16 days. In how many days can X and Y together finish the work?
A job is done by 15 men in 30 days and 30 women in 20 days. How many days will it take for 8 men and 12 women to finish the work?
P can do a piece of work in 20 days, Q can do the same piece of work in 24 days while R can do it in 30 days. They started working together but after 4 ...
12 engineers complete designing 180 blueprints in 15 days. If the goal is to complete 270 blueprints in 18 days, how many engineers are required?