Question
A, B, and C can do a piece of work in 6 days. If A alone
can do this work in 36 days and B alone can do it in 12 days, then in how many days will C alone complete the work?Solution
A+B+CABC 63612 36 (total work) 6132 (total efficiency) Efficiency of C = (A+B+C)-(B+A) =6-4=2 C alone complete the work =36/2 =18daysÂ
Aluminium Phosphide is used to control stored grain pest _____
‘Centering’. The first cut on a young tea plant is at which of the following:Â
Water is drawn upwards from the water table in a continuous network of pores. This upward movement of water occurs only in saturated soils is called
What is the major limitation of privatized extension services?
The land-related reform enacted to protect tenants from eviction and secure their right to cultivate the land is known as:
Triazines and triazinones inhibit ______
The critical limit for NO3-N (mg/litre) in drinking water (as per WHO standard is:
Khaira disease of rice can be controlled by spraying of ____________ .
Bengal famine in 1943 was caused due to which disease?
The scientific name of the Italian honey bee is