Question
Which of the following can be the reasons behind the
number of earthquakes in Delhi in recent times? 1. Closeness to main boundary thrust fault. 2. Movement of the Indian tectonic plate. 3. Loose soil in the Ganga Alluvial Plain. 4. Presence of many weak zones and faults. Select the correct answer using the code given below:Solution
Option 1 is correct. Delhi is located within a distance of 200-400 km from diff erent locations of the main boundary thrust fault. The main boundary thrust fault of the Himalayas, which runs from Kashmir to Arunachal Pradesh, is highly active. Option 2 is correct. Earthquakes in Delhi-NCR were due to the “release of stress” accumulated from the movement of the Indian tectonic plate and its collision with the Eurasian tectonic plate. Option 3 is incorrect. The “large sediment thickness (loose soil) in the Ganga Alluvial Plains” to the north of Delhi t ends to amplify the impact of earthquakes. It is not directly responsible for the generation of earthquakes. Option 4 is correct. There are so many weak zones and faults in the Delhi-NCR: - Delhi-Haridwar ridge, Mahendragarh-Dehradun subsurface fault, Moradabad fault, Sohna fault, Great boundary fault, Delhi-Sargodha ridge, Yamuna River lineament, Ganga River lineament etc.
A, B and C can do a piece of work in 5, 8 and 10 days respectively. They start working together but C leaves after working 1 days and B, 2 days before t...
If 12 men working 12 hours a day can make 12 quilts in 12 days, then in how many days 24 men working 24 hours per day will make 24 quilts?
- Alex and Ben can complete a job individually in 14 days and 21 days, respectively. If they take turns to work one day each, beginning with Alex, how long w...
- Working 6 hours a day, Rahul can complete a work in 25 days. How many hours a day should he work to complete the same work in 15 days?
114 unit of work can be completed by P alone in 19 days. P started working alone and joined by Q after 10 days such that they completed the remaining wo...
The ratio of time taken by P, Q and R to complete work alone is 4:5:3 respectively. If all three together complete the work in 6 days, then find in how ...
'M' alone finishes a project in 30 days. 'M' and 'N' together can complete the same project in 16(2/3) days. How many days would 'N' need to do the proj...
Mira is 40% more efficient than Priya, and Neha is 10% more efficient than Mira. If Neha and Mira together can do a piece of work in 15 days, in how man...
P does one fourth as much work as Q in two third of the time. If together they take 24 days to complete the work, how much time shall Q take to do it?
A 210 litres mixture contains only water and phenyl in the ratio 3:2, respectively. If 60 litres of this mixture is replaced with 100 litres of alcohol,...