Question
Which of the following can be the reasons behind the
number of earthquakes in Delhi in recent times? 1. Closeness to main boundary thrust fault. 2. Movement of the Indian tectonic plate. 3. Loose soil in the Ganga Alluvial Plain. 4. Presence of many weak zones and faults. Select the correct answer using the code given below:Solution
Option 1 is correct. Delhi is located within a distance of 200-400 km from diff erent locations of the main boundary thrust fault. The main boundary thrust fault of the Himalayas, which runs from Kashmir to Arunachal Pradesh, is highly active. Option 2 is correct. Earthquakes in Delhi-NCR were due to the “release of stress” accumulated from the movement of the Indian tectonic plate and its collision with the Eurasian tectonic plate. Option 3 is incorrect. The “large sediment thickness (loose soil) in the Ganga Alluvial Plains” to the north of Delhi t ends to amplify the impact of earthquakes. It is not directly responsible for the generation of earthquakes. Option 4 is correct. There are so many weak zones and faults in the Delhi-NCR: - Delhi-Haridwar ridge, Mahendragarh-Dehradun subsurface fault, Moradabad fault, Sohna fault, Great boundary fault, Delhi-Sargodha ridge, Yamuna River lineament, Ganga River lineament etc.
Two pipes A and B can fill a tank in 24 min., and 32 min, respectively. If both the pipes are opened simultaneously, after how much time B should be clo...
- Two pipes, A and B, can fill a tank together in 72 minutes. Both pipes are turned on at the same time. However, pipe B is turned off after 60 minutes, and ...
If 18 men working 18 hours a day can make 18 quilts in 18 days, then in how many days 27 men working 12 hours per day will make 27 quilts?
- Pipes A and B can fill a cistern in 48 and 80 minutes respectively. Another pipe C can empty the cistern in 1 hour 36 minutes. A and C are opened first. Af...
- 24 men can complete _______% of the whole work in 12 days working 10 hours in a day. 30 men working 8 hours in a daycan complete 30% of the whole work in _...
A can complete a work in 20 days. B takes 10 days less than A to complete the same work. In how many days can both of them together complete 90% of the ...
In an office, an employee plans to do a work in 12 days with 4 laptops. But after 4 days, he found that only 40% of the work is done with the laptops wo...
‘A’ and ‘B’ can do a piece of work in 20 days and 40 days, respectively. If they started the work together and worked on it for 6 days, then fin...
‘A’ and ‘B’ can do a piece of work in 12 days and 24 days, respectively. They started working together but ‘A’ left after 4 days. Find the t...
A group of workers was put on a job. From the second day onwards, 1 worker left work everyday. If no worker was left when 52% of the work gets complete...