The Green Energy Corridor Project aims at synchronizing electricity produced from renewable sources, such as solar and wind, with conventional power stations in the grid. For evacuation of large-scale renewable energy, Intra State Transmission System (InSTS) project was sanctioned by the Ministry in 2015-16. It is being implemented by eight renewable-rich states of Tamil Nadu, Rajasthan, Karnataka, Andhra Pradesh, Maharashtra, Gujarat, Himachal Pradesh, and Madhya Pradesh. The project is being implemented in these states by the respective State Transmission Utilities (STUs).
The Colletotrichum falcatum produces :
The herbicides which are ineffective on perennial plants that are able to regrow from roots or tubers.
Arrangement of soil particles is referred to ..............?
Sulphate navel stores are by-products of the following pulping process:
The number of replications are equal to number of treatments in the _________
Short term credit is usually for a period of ranging up to:
This leg type is observed in insects like the praying mantis, featuring spiny femurs and tibiae that interlock to form a gripping mechanism
Which one of the following is the nutrient has a key role in biology N-fixation?
ICAR – Central Institute of Agriculture Engineering is located at
Crop loan is which type of loan?