Question
Tata Power Renewable Energy Limited has tied up with
which state for a 28.12 MW green energy project?Solution
Tata Power Renewable Energy Limited (TPREL) has partnered with Sanyo Special Steel Manufacturing India Pvt Ltd (SSMI) to set up a 28.12 MW green energy plant in Maharashtra. TPREL, an arm of Tata Power, has signed a Power Delivery Agreement (PDA) with Sanyo through TP Alpha Limited. This plant will be set up at Achegaon in Solapur district of Maharashtra.
Which of the following parameter is not included in the Soil health card?
Under Soil Health Card Scheme, what is the cycle of testing of soil for irrigated area and area from which single sample is to be drawn?
The absolute density of soil is also referred to as ……………….which is generally 2.60-2.75 gm/cm3
The term “operational holding” refers to
Which of the following types of soil is known for exhibiting a characteristic honey-comb structure, typically formed due to specific environmental condi...
Which of the following is the progeny of breeder seed and is responsible for producing certified seed?
Example of igneous rock is
Which of the following groups of nutrients is absorbed by plants only in anionic form?
Which soil property is least affected by the size and arrangement of soil particles?
What term is used to describe the process when the parent material is moved or transported primarily by the force of gravity?