Explanation: Stratified sampling divides the population into distinct subgroups or strata based on shared characteristics, such as age, income, or geography. A random sample is then taken from each stratum, ensuring that each subgroup is adequately represented in the sample. This method improves the accuracy of analysis, particularly when the population is heterogeneous, by reducing sampling error and increasing statistical efficiency. Stratified sampling is widely used in surveys and studies where subgroup representation is critical. Option A: While stratified sampling optimizes sampling, it does not inherently minimize the sample size but rather focuses on balanced representation. Option C: Bias can be reduced but not completely eliminated, even in stratified sampling, due to potential flaws in subgroup identification. Option D: Selection in stratified sampling is not based on discretion but on random sampling within strata. Option E: Fixed intervals are a characteristic of systematic sampling, not stratified sampling.
‘A’ and ‘B’ can do a piece of work in 25 days and 30 days, respectively. If they started the work together and worked on it for 8 days, then fin...
‘A’ can complete a work in 18 days and is 10% more efficient than ‘B’. ‘A’ and ‘B’ start the work together, but ‘A’ leaves after 15 ...
John does ½ piece of work in 3 hours, Joe does ¼ of the remaining work in 1 hour and George finishes remaining work in 5 hours. How long w...
A buffalo alone can plough field ‘A’ in 40 days. A Bull alone can plough the field ‘A’ in 80 days. Find the number of days taken by 3 bulls and ...
(x) men can do some work in 42 days. If 10 more men added then the work would have been completed in 30 days, then in how many days (x+45) men can do th...
A and B together can complete a work in 12 days, and B alone can complete it in 20 days. How many days will A take to complete the work alone?
In an office, an employee plans to do a work in 15 days with 6 laptops. But after 8 days, he found that only 50% of the work is done with the laptops wo...
Karan, Arjun and Krunal alone can complete a work in 50, 75 and 60 days respectively. All of them started working together but after 9 days from start K...
30 men can complete a task in 160 days. 12 men start the work and manage to do half of it. Then, 18 more men are added to the team to help finish the wo...