Start learning 50% faster. Sign in now
Get Started with ixamBee
Start learning 50% faster. Sign in nowLabour Force Participation Rate (LFPR): LFPR is defined as the percentage of persons in labour force (i.e. working or seeking or available for work) in the population. It includes persons who are working, seeking work and available for work. Worker Population Ratio (WPR): WPR is defined as the percentage of employed persons in the population. Unemployment Rate (UR): UR is defined as the percentage of persons unemployed among the persons in the labour force. Activity Status- Usual Status: The activity status of a person is determined on the basis of the activities pursued by the person during the specified reference period. When the activity status is determined on the basis of the reference period of last 365 days preceding the date of survey, it is known as the usual activity status of the person. Activity Status- Current Weekly Status (CWS): The activity status determined on the basis of a reference period of last 7 days preceding the date of survey is known as the current weekly status (CWS) of the person.
A train travelling with a speed of ‘x’ km/h can cross a pole in 6 seconds, and a 180 metre long platform in 15 seconds. Find the distance travelled ...
A train 150 m long running at 36 km/hr takes 50 seconds to cross a bridge. The length of the bridge is
Train ‘A’ running with a speed of 72 km/h crosses a pole in 8.5 seconds. If the time taken by train ‘A’ to cross train ‘B’ running with a sp...
600 metre long train ‘A’ is running with a speed of 57.6 km/hr. Train ‘B’ which is 641 metre long is running with a speed of 90 km/h in opposite...
A train takes 16 seconds to pass a stationary boy. The same train requires 38 seconds to traverse a platform measuring 495 meters in length. Determine t...
Train 'C' running with a speed of 90 km/hr crosses a pole in 8 seconds. In how much time will train 'C' cross train 'D' whose length is 80 meters more a...