What is the full form of
PERT?Solution
Various network techniques are used for planning, scheduling (programming) and controlling the progress of projects. Project Evaluation and Review Technique (PERT) and Critical Path Method (CPM) are two most widely used network techniques. PERT is a project management planning tool used to calculate the amount of time it will take to realistically finish a project.
- A train, running at the speed of 72 km/h, is 300 metres long. How much time (in seconds) will it take to pass over a bridge that is 600 metres long?
Two trains of same length are running in parallel tracks in the same direction with speed 60 km/hr and 90 km/hr respectively. The latter completely cros...
A goods train leaves a station at a certain time and at a fixed speed. After 10 hours, an express train leaves the same station and moves in the same di...
- Two scooters βGβ and βHβ started at the same time from two towns βUβ and βVβ towards each other. When they met after 4 hours, scooter βHοΏ½...
Train A running at a speed of 31 km/hr crosses train B in 20 seconds. Find the speed of train B (in km/hr), if the sum of the length of train A and B is...
Two trains of same length are running in parallel tracks in the same direction with speed 26 km/hr and 80 km/hr respectively. The latter completely cros...
A person sees a train passing over 4 km long bridge. The length of the train is half that of bridge if the train clears the bridge in 4 mins. What is th...
- Kiran is sitting inside train X which is travelling at a speed of 55 km/h. Another train Y, whose length is four times the length of train X and travelling...
Train A, moving at a speed of 90 km/h, passes a stationary pole in 9.4 seconds. When encountering Train B, which is traveling towards it at a speed of 5...
500 metre long train βAβ is running with a speed of 97.2 km/hr. Train βBβ which is 656 metre long is running with a speed of 90 km/h in opposite...