Question
P can do a piece of work in 20 days, Q can do the same
piece of work in 24 days while R can do it in 30 days. They started working together but after 4 days ‘P’ left the work and the remaining work was completed by Q and R together. Find in how many days will the work be completed?Solution
P – 20 days P – 6 unit Q – 24 days LCM = 120 Q – 5 unit R – 30 days R – 4 unit Work of all 3 per day is (6 + 5 + 4) – 15 units All worked for 4 days. So, 4 days work is 4 × 15 = 60 units Remaining work = 120 – 60 = 60 units That work done by Q and R their per day unit = (5 + 4) = 9 unit Remaining work done by Q and R is `60/9` days = `6 2/3` days
The phenomenon of splitting white light into its component colours is called:
Which of the following reproduces using fission?
Which one of the following crops enriches nitrogen content in the soil?
What is the velocity of light in a diamond if the refractive index of diamond with respect to vacuum is 2.5?
Which of the following vitamin contains Cobalt?
Which among the following nutrients is essential for the normal functioning of the thyroid gland?
Two identical metallic spheres are charged. One has +Q charge, the other –Q charge. They are connected by a conducting wire. After equilibrium:
...Study the following questions carefully and choose the right answer:
The main thinking part of the brain is the _______?
Which of the following metals can displace hydrogen from dilute acids?
A projectile is fired at an angle of 45° with a speed of 20 m/s. What is the maximum height reached? (Take g = 10 m/ s² )